Get started
Blog · Priorities

The big rocks method: how to get organized when you run a small business and still keep time for yourself

The big rocks method falls short in a small business: projects swell, interruptions overflow. A practical version to set priorities and keep time for yourself. · October 19, 2026 · Victoria · 8 min read

A stone carver sculpts a marble bust in his workshop; on the workbench, three jars: one empty, one filled with sand and gravel, one where the big rocks went in first
In the carver's workshop, the same jar filled three ways: only the order changes.
FluidOps
Plan what matters first
FluidOps brings project management together in one place and helps small businesses turn operational problems into structured action plans.
Discover FluidOps

Table of contents

The stone carver and the business owner

In Veiller sur elle (“Watching Over Her”, winner of the 2023 Prix Goncourt), Jean-Baptiste Andrea tells the story of Mimo, a gifted sculptor in a body that is too small, yet able to bring a work of art out of a raw block of marble.

Faced with a raw block, the amateur wants to carve everything at once. The stone carver studies the stone, finds its fault lines and removes material stroke by stroke until the shape emerges. For a small business owner, it is exactly the same.

This novel made me reread a short story I had found in Écoute tes émotions pour te libérer (“Listen to your emotions to set yourself free”) by Dr Marine Colombel: the big rocks metaphor, made famous by Stephen Covey in First Things First.

The story of the jar and the big rocks

A teacher fills a jar with big rocks and asks whether it is full. The students say yes. He adds gravel, which slips between the rocks, then sand, then water. His lesson: if you start with the sand, there is no room left for the big rocks.

Where the classic model falls short

The jar story rests on a false assumption: that the jar has a fixed size and the rocks never change volume. In a small business, that is never true.

The stone carver's principle

Do not put a raw block of marble in your calendar. If your big rock is called “Restructure the sales team” or “Rebuild the website”, it is a three-ton block that fits nowhere: it will jam the top of the jar, and everything else will turn into an emergency.

Be Mimo: one precise chisel stroke to free a single usable piece. David Allen calls this the “next physical action”: the smallest concrete step that moves the project forward (Allen, 2001).

A well-carved rock always fits without overflowing. And a precisely scheduled task stops taking up our thoughts, even before it is done (Masicampo and Baumeister, 2011). To go further, see why breaking down tasks boosts productivity.

A white marble bust of a woman with flowers in her hair, in a sculptor's workshop
The carver does not shape the whole block at once: he removes material, stroke by stroke.

Leave room in the jar

If you fill the jar to the brim with four or five big rocks on Monday, the smallest grain of sand (a client call, a supplier problem) will make it overflow.

Put in only two big rocks a week, no more. The rest of the space is deliberately left empty. That space is not wasted time: it is where the gravel and sand will settle without crushing your priorities or eating into your personal time.

The black rock: you

In the classic metaphor, time for yourself is just one rock among others. Yet if the business owner breaks down, it is the jar that breaks.

The first rock to put in the empty jar is your recovery time: the “black rock”. This slot is not negotiable and does not move. The company's projects are arranged around it. Truly detaching from work, relaxing and doing something else helps recharge your resources (Sonnentag and Fritz, 2007).

The revised trade-off matrix

What goes in the jarClassic mistakePractical small-business approach
The black rock (personal time)Put in last, if there is roomPut in first, in the empty jar
The big rocks (long-term projects)Too big and vagueCarved into actions of less than 90 minutes
The gravel (obligations)Handled continuouslyGrouped in a fixed time slot
The sand (interruptions, emails)Endured as it comesAbsorbed by the empty space in the jar

To sort what remains between urgent and important, the Eisenhower matrix takes over.

Your week in practice

  1. Place the black rock. On Monday morning, block your recovery time first.
  2. Choose two big rocks. Carve them into actions of less than 90 minutes and give each one a slot.
  3. Group the gravel. Set a fixed time slot for routine obligations and delegate whatever can be delegated.
  4. Leave the rest empty. That is your margin for the sand.
  5. Review on Friday. Did the rocks swell? Did the sand overflow? Adjust the size of your rocks the following week.

Stepping back: what psychology taught me

I have always been interested in psychology as a way to better understand the world and other people. As soon as you work in a team, you need to step back to see the whole picture.

A stone carver does not spend the day sweeping the workshop floor. He sweeps to keep his space clean, but his day only has meaning if a chisel stroke has moved his work forward. The sand in our days is that dust: it has to be dealt with, without letting it take the place of the work.

And like every carver, he looks after his hands and his tools: without them, there is no work. That is the whole point of the black rock.

Included in the free plan

In FluidOps, the Eisenhower matrix and the other optimization tools are available without any paid add-on. You can then track your big rocks on a Kanban board, schedule them in a Gantt chart and sync them with Google Calendar or Outlook.

The free plan costs €0 per month, the Individual plan €12 per month or €120 per year, and the Enterprise plan starts at €12 per seat per month, billed annually. Full details are on the pricing page.

Frequently asked questions

What is the big rocks method?

It is a prioritization method popularized by Stephen Covey: you put the truly important tasks in your calendar first, then fill the remaining time with everything else.

How many big rocks should you plan per week?

Two, no more, each broken down into actions of less than 90 minutes. The rest of the week stays deliberately free to absorb the unexpected.

What is the “black rock”?

It is your recovery time. You put it in your calendar first, and the company's projects are arranged around it.

Why do projects take longer than planned?

It is the planning fallacy described by Daniel Kahneman: we almost always underestimate the time complex tasks require.

Is the Eisenhower matrix available in FluidOps?

Yes, it is one of the optimization tools included in the free plan.

Sources

← BackAll articles Next article →Connecting Google Calendar to project management: the guide to scheduling your tasks in 1 click